Total Solar PV Capacity Installed:
370kWp
Annual Production:
240MWh
Annual Savings (2023):
£68,000
Annual Carbon Savings (t/CO2e):
56t
Inverters:
SolarEdge
Panels:
JA Solar
We have installed 312.36kWp across 4 Dry Silo Mortar Manufacturing establishments across the UK. These sites spanned the UK, from Manchester, all the way down to Southampton.
SolarEdge technology was established to be necessary for this installation due to the nature of the sites.
The systems have seen 304MWh’s of production thus far, and this set to increase again as we have been instructed to install a 50.08kWp in the South-West of England, which we are excited to complete in April 2024.
The solar panel installation from Amelio Solar Energy is helping our pig farm reduce its costs considerably as we have a constant demand for electricity across all our sites.
Amelio Solar Energy, found the best solution for installation solar panels on our hotel. They then installed without any disturbance to our guests and helped us change things around to make the best use of the solar electricity that we are now generating.
From the outset it was a friendly and pleasant experience. From the initial survey to the final installation of the batteries it all went very smoothly. It has all worked as they said it would. Well done Amelio.